Skip to content

Before Photos

  • by
Before Photos

As promised, you can see yonderways in all it’s “before” glory by selecting the PHOTOS link in the main navigation. Select the featured picture to view the gallery.

In case you’re interested – below is the list of projects for the rehab. Presently the main cottage has appx 1200 heated square feet. When complete the cottage will sport a modest 1500sf. We’re gutting the entire home down to the studs (for the exception of the floors). Let me start from the ground up:

  • Shoring up a few foundation issues, mostly due to walls being located
  • Sealing and insulating crawl space
  • Striping all walls back to studs
  • Electrical – all new wiring to code, new 200 amp service
  • HVAC heating/cooling
  • Plumbing – all new & also plumbing for propane service (on demand hot water tank, grill, stove, gas logs)
  • All new windows and doors
  • Many new sun tunnels to allow for natural light
  • New insulation
  • Enclosing porch for 2nd bath/laundry combo
  • Expanding master closet
  • New master bath with walk-in shower, soaking tub, double vanity and toilet
  • Kitchen is being relocated to current dining room
  • Dining room will be located in present kitchen
  • All new sheet rock walls and ceilings to make more energy efficient
  • Enclosing porch for Keith’s study
  • Creating a Portico for home entrance
  • And, finally, if the budget allows we hope to add a deck off master to connect to screen porch

And, it’s imperative we pull this off on a very tight budget and in 4 months (we have 6 months before our balloon note to the sellers is due). We are partnering with a super contractor. He’s allowing us to do a great deal of the work, such as demolition and some finish work. It’s bound to be an adventure, so I hope you’ll stay tuned.

This is one of the most disturbing photos – new wiring was tied into old wiring with no junction box or wiring caps, and laying bare underneath insulation. All sorts of wrong!

Fire anyone?
Fire anyone?